Kittery Point, Maine

 

This was part of a larger renovation project. The home was built in the 1980s and had not undergone updating since its construction. After the Deep Freeze of March 2007, there was interior damage to the home resulting from frozen pipes in the 2nd floor bath.

 

The main entry to the home was given a makeover including:

 

Repainting

Removal of old tile flooring

Installation of Radiant floor heat

Installation of 13 x 13 Terra Cotta Tile (angled installation which blended into kitchen)

Installation of New entry lighting

Re-decorating utilizing existing as well as new purchases