Kittery Point, Maine

 

This was part of a larger renovation project. The home was built in the 1980ís and had not undergone updating since its construction.After the Deep Freeze of March 2007, there was interior damage to the home resulting from frozen pipes in the 2nd floor bath.††

 

The master bedroom was:

 

Partially re-painted with partial repair/replacement of one wall.

Utilizing existing furniture and artwork, the room was given a clean fresh look