Kittery Point, Maine

 

This was part of a larger renovation project. The home was built in the 1980ís and had not undergone updating since its construction.After the Deep Freeze of March 2007, there was interior damage to the home resulting from frozen pipes in the 2nd floor bath.

 

The 1st floor bathroom was seriously damaged from the pipe freeze.The face lift in this room included:

 

Removal and replacement of damaged walls/ceilings

Installation of new overhead light/fan combo

Installation of new baseboard heating

Removal of damage cork flooring

Installation of Radiant floor heat

Installation of new Tile floor

Installation of new Colonial baseboard trim

Repainting of Walls

Re-decorating with new wall accessories/stonework/artwork and furniture.

A dramatic transformation.